In addition to considering various factors in site selection, it is necessary to pay attention to the asphalt mixing plant and keep it away from residential areas and farmland. Before installation, the equipment should be debugged to confirm whether there are scratches and wear, and lubricated according to the established bearings. Secondly, technicians must confirm the normal operation of equipment and electrical systems during the inspection process. If there are any abnormal situations, they must be checked in a timely manner to eliminate safety hazards. Due to the involvement of numerous materials in the mixing plant, consideration must be given to all surrounding resources. The asphalt mixing plant should be selected reasonably according to the geological conditions, mainly divided into two types: on-site and soft foundation. Due to the relatively hard soil in the field, the bottom layer should be properly erected and paved after excavation. Secondly, the foundation concrete construction procedure should be considered, and the filling degree after excavation should be analyzed. After the excavation and layout of the soft foundation, different technical processes can be selected to reinforce the bottom of the foundation, generally in the form of plum blossom wooden piles and vibrating casing.
In order to prevent the gradual increase of the foundation area at the bottom and achieve the bearing capacity of the foundation, it is necessary to analyze the hidden dangers of foundation cracking and sinking equipment production in practice. During the foundation construction process, attention should be paid to the foundation pouring of the main building and the aggregate drying part. During the foundation installation process, it is necessary to ensure that the same horizontal plane does not exceed the standard height, thereby minimizing the resonance hazard. Through effective installation procedures, the installation is centered around the main building and radiates to three sides. While large equipment occupies space, the basic tasks of the large crane must be completed in a relatively short period of time, thereby achieving the goal of cost savings.
Cable installation
In recent years, with the continuous increase in the number of mixing stations, the power consumption of the entire motor has also increased, generally ranging from 500 to 1000 kW. Due to the large cross-sectional area of the power supply line, it is necessary to use cable trays and hidden grooves to arrange it reasonably during the control of the components. During the layout process, the cable table should be carefully checked. In order to avoid open circuits, self-adhesive high-voltage adhesive tape should be selected for effective connection.
In the process of controlling the system circuit, the signal should be shielded first and arranged according to the established requirements. In order to reduce the impact of external electromagnetic interference on the system, it is necessary to carry out concealed protection for the circuit, provide safety protection warnings, and choose oil circuits and high-temperature areas as much as possible for the circuit direction. If the coordinates are not clear in practice, they should be put aside first, and the lines should be checked and analyzed in detail in the final commissioning process. In order to make up for the missing, they should be improved one by one to avoid line damage.